| APROVED  BY 3rd PARTY INSPECTION AGENCIES & CONSULTANCY :  | 
                  
                  
                    |   | 
                  
                  
                    
                      
                         01. LLOYDS  Register of Shipping (LRIS)  
                          02. Indian Register of Shipping  (IRS)  
                          03. Mercentile marine Deptt. (MMD)  
                          04. TATA Consultancy Enginner (TCE)  
                          05. DET Norsk Veritas (DNV)  
                          06. Metalogical Consultant Engineer  LTD. (MECON)  
                          07. Nucler Power Corporation LTD.  (NPCIL)                      | 
                        08. Industrial Boiler Regulation  (IBR) 
                           
                          09. SGS India PVT. LTD.
                           
                          10. BAX Councel Inspection PVT. LTD. 
                           
                          11. Bureau Veritas (India) PVT LTD. 
                           
                          12. PDIL 
                           
                          13. R. Sing & Associates. 
                           
                          14. Korus  Engg. solutions PVT. LTD.  | 
                       
                      | 
                  
                  
                    | - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  | 
                  
                  
                    |   | 
                  
                  
                    | MATERIAL SPECIFICATION OF FITTING :  | 
                  
                  
                    |   | 
                  
                  
                    
                      
                        | 01. Buttweld fittii :  | 
                        SA-234, WPB, WP-11, WP-12. WP-22, SA-403 WP-304L, Wp316/316L, WP321 | 
                       
                      
                        |   | 
                          | 
                       
                      
                        | 02. Forged fitting :  | 
                        SA-105, SA-182.304L.316L F-11, F22, F-5 | 
                       
                      
                        |   | 
                          | 
                       
                      
                        | 03. Flange :  | 
                        SA-105,IS-2062,IS-2002, SA-182, 304, 316 316L, Brass, Aluminium | 
                       
                      | 
                  
                  
                    | - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  | 
                  
                  
                    |   | 
                  
                  
                    | QUALITY ASSURANCE PLAN :  | 
                  
                  
                    |   | 
                  
                  
                    | Quality Assurance plan are prepared in accordance with  specific requirements stated  by customer. | 
                  
                  
                    | - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  | 
                  
                  
                    |   | 
                  
                  
                    | MATERIAL CONTROL : | 
                  
                  
                    |   | 
                  
                  
                    | The system control the quality of incoming raw  material with test certificate and random checking each size for physical &  chemical, ultrasonic at Government approved Laboratory. | 
                  
                  
                    | - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  | 
                  
                  
                    |   | 
                  
                  
                    | PROCESS CONTROL :  | 
                  
                  
                    |   | 
                  
                  
                    | During forming, pressing, Forging and heat  tretment-process control system is followed. | 
                  
                  
                    | - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  | 
                  
                  
                    |   | 
                  
                  
                    | MACHINING  & DIMENSIONAL CONTROL :  | 
                  
                  
                    |   | 
                  
                  
                    Suitable  fixture and templets are used to maintain dimentional accuracy. Necessary gauges and callipers are calibrated periodically to  maintain their accuracy.  | 
                  
                  
                    | - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  | 
                  
                  
                    |   | 
                  
                  
                    | FINISHING,  PAINTING & MERKETING :  | 
                  
                  
                    |   | 
                  
                  
                    | Carbon and Alloy Steel fitting are shot blasted,  painting, and stainless steel fittings are pickled and passivated. All fitting are  marked with size, schedule, specifications with manufacturers stamp. | 
                  
                  
                    | - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  | 
                  
                  
                    |   | 
                  
                  
                    | CERTIFICATION :  | 
                  
                  
                    |   | 
                  
                  
                    | Fittings are supplied with Test Certificate as per  approved QAP. Test Certificate incorporate chemical, physical, Hardness  properties. Our orgnisation is ISO-9001 2000 certified. | 
                  
                  
                    |   |