Planning Consideration Area Statement Facilities and Amenities Specification
 

Specifications :

 

Building
R.C.C. Framed structure with brick walls

Internal finish
Room Walls - Teflon / Latex coated Acrylic emulsion paint / Texture Paint / Textured wall paper over P.O.P finished wall.
Toilet Walls - Plastic paint on P.O.P.
Room Floor & Skirting - Vitrified Tiles, Marble, Wooden flooring Etc.
Toilet Floor & Dado - Anti-skid tiles (Ceramic)
Stair case floor - Marble & Granite
Stair case Railing - Stainless Steel / Wood
Kitchen - Modular Kitchen with Granite counter top
Kitchen Sink - Stainless Steel
Toilet Fittings - Jaguer or equivalent
Toilet Fixture - Bath tub and other fixtures of Hindware or equivalent make / Shower Cubicle
Windows - UPVC
Door - Main Door- Panelled Wooden
          Inside - Flush door
         Toilet - Flush door 
Water Pipe line - G.I. Pipe
False Ceiling - P.O.P false ceiling on Drawing Room
Electrical - Modular Switches and Sockets (Anchor/ Havells or equivalent),Wiring with Havells or equivalent, energy saver lights with light fittings.

External finish
Walls - Natural stone tiles, Pre-cast C.C tiles, Weather coat paint (Water proof).
Roof  - Roof Tiles With water proof treatment.
Parking Area - Designer C.C. Tiles.