|   | 
             
            
              QUALITY CONTROL : 
                
                  - Primex Engineers believe in quality control right from  the selection of
                    Row Materials, manufacturing process and final inspection,
 
                  - A Quality Assurance Plan is made for  every job separately and follow
                    strictly with documentation, 
 
                  - Materials are tested from Govt, authorised testing laboratories to confirm
                    the specification before use.
 
                  - Tubes are tested for flaring, flattering etc. In case of bulk supply  Eddy
                    Current Test  Certificate is obtained from manufacturer.
 
                  - Tube Sheets are properly drilled,  grooved for proper sealing keeping in
  mind  of orientation and passes,
 
                  - Tubes are expanded as per standard and sometimes welded with seat as
                    per requirements of customers, 
 
                  - Welding joints are radiographed as per standard,
 
                  - Heat Exchangers are them Hydraulically  tested from tube side as well as
                    shell side as per specification,
 
                  - Before dispatch,  tube and shell sides  are flashed with compressed
                    Air/Nitrogen, blind  all nozzles to prevent rust formation and entry of any
                    dust/foreign  materials respectively,
 
                  -  Two  coats of Primer(Red Oxide) is applied if not specified,
 
                  - If drawing is not available, we have  facility to develop drawing,
 
                  -  In  case of New Heat Exchangers, we have the facility to design the same
                    with  software.
 
                                  | 
             
            
              |   | 
             
            
            |