Primex Engineers believe in quality control right from the selection of Raw   Materials, manufacturing process and final inspection.
                    - A Quality Assurance Plan is made for every job separately and follow   strictly with documentation.
 - Materials are tested from Govt, authorised testing laboratories to confirm   the specification before use.   
                    
                    
 - 
                      
Tubes are tested for flaring, flattering etc. In case of bulk supply Eddy   Current Test Certificate is obtained from manufacturer.   
                                                
                     - Tube Sheets are properly drilled, grooved for proper sealing keeping in mind   of orientation and passes.
                    
 - Tubes are expanded as per standard and sometimes welded with seat as per   requirements of customers.
                    
 - Welding joints are radiographed as per standard.
                    
 - Heat Exchangers are them Hydraulically tested from tube side as well as   shell side as per specification.
 - 
                      
Before dispatch,  tube and shell sides  are flashed with compressed   Air/Nitrogen, blind all nozzles to prevent rust formation and entry of any   dust/foreign materials respectively.
                     - Two coats of Primer(Red Oxide) is applied if not specified.
                    
 - If drawing is not available, we have facility to develop drawing.
 - In case of New Heat Exchangers, we have the facility to design the same with   software.