Name of the Client |
Project |
Period |
Job Value |
CALCUTTTA CHEMICAL |
EPABX Installation |
89-90 |
2 Lakhs |
UNITED PROPERTIES
For the Project Windsor Palace,
6A, Iron Side Rd |
Wiring including installation of main power system for 74 nos. of flats of 6A Iron side road, Kolkata |
90-92 |
20 Lakhs |
NILANCHAL ESTATE |
Wiring including installation of main power system for 150 nos. of flats at Oxford view, Behala |
91-93 |
10 Lakhs |
NEON APARTMENT |
Wiring including installation of main power system at Hindustan Park |
92-93 |
1.5 Lakhs |
ORISSA INDUSTRIES,
ROURKELLA |
EPABX system installation including entire cabling |
92-93 |
2 Lakhs |
MEHERIA & CO. |
Entire Electrification at 9, Old Post Office Street. Kolkata |
91-92 |
0.65 Lakhs |
CG.CR.I.
JADAVPUR UNIVERSITY |
Manufacture and installation of Thyristor Control Panel with Temperature Controller. |
92-94 |
2 Lakhs |
ASSAM TIMBER CO |
Entire Electrification at Sarat Bose Road |
95-96 |
1.43 Lakhs |
HINDUSTAN CABLES LTD.
NARENDRAPORE |
Manufacturing & installation control panel for Dry Armoring machine consisting of Thyristor drive PIC. and field instrumentation at Rupnarayanpore works |
95-96 |
4 Lakhs |
SHAWLLACE & CO. LTD |
Complete electrical installation on management information center at 3 rd floor, 4, Bankshal street, Kolkata |
93-94 |
7 Lakhs |
WEBEL |
Electrical installation |
93-94 |
0.65 Lakhs |
UNIT TRUST OF INDIA
THROUGH
M/S ELITE INTERIOR |
Complete electrical installation of Jamshedpur, Bihar |
93-94 |
5 Lakhs |
D.V.C |
Complete electrical installation at Corporate Floor, Guest House & Reception |
94-95 |
12 Lakhs |
W.B.LD.C |
Complete electrical installation at 1st Floor, 5, Council house street, Kolkata |
94-95 |
7.5 Lakhs |
TATA IRON & STEEL CO. LTD.
TATA STEEL |
Complete electrical installation at 43, Chowrunghee rd. Kolkata. |
97-98 |
7.5 Lakhs |
CHATTERJEE GROUP OF INDUSTRIES |
Complete electrical installation at 9B, Wood street |
96-97 |
2.8 Lakhs |
BANGALCLUB |
Complete electrical installation at Club at Little Russell St Kolkata. |
96-97 |
4.86 Lakhs |
SOFTWARE TECHNOLOGY
SALT LAKE |
Complete electrical installation at Salt Lake Office |
96-97 |
0.82 Lakhs |
BOMBAY MERCANTILE BANK |
Complete electrical installation at Circus Road |
96-97 |
2 Lakhs |
INDO BURMA PETROLEUM CO. |
Complete electrical installation at 34, Nirmal Ch. Street Kolkata-700012 |
97-98 |
8.67 Lakhs |
PATTTON TANK LTD. |
Entire Electrification at Camac street Office |
97-98 |
2.85 Lakhs |
SHREE RAM GARDEN |
Entire Electrification at Alipore Road |
98-99 |
1.75 Lakhs |
MANARA |
Entire Electrification at 12, Upper Wood street Office |
98-99 |
1.5 Lakhs |
STATE BANK OF SAURASTRA |
Entire Electrification at 1A A.T.M. road Kolkata |
98-99 |
1.5 Lakhs |
J.THOMAS |
Entire Electrification at R.N. Mukherjee Road Nilhut House |
98-99 |
2 Lakhs |
SHRUTINANDAN |
Entire Electrification at 20, golf Club Road, Kolkata
(A project of Pandit Ajoy Chakraborty) |
99-2000 |
7.2 Lakhs |
PROCTOR & GAMBLE |
Entire Electrification at B.T road |
99-2000 |
0.48 Lakhs |
VIDESH SANCHAR NIGAM LIMITED (VSNL) |
Entire Electrification at Tadanga main road |
99-2000 |
6.5 Lakhs |
L.K.P |
Entire Electrification at park, Park Mansion |
99-2000 |
2 Lakhs |
PATTONTANK |
Entire lectrification at 7th floor of 3C camac street.The Corporate Office Of M/s Patton |
2000-2001 |
3.1 Lakhs |
BUOY CHOWDHURY & MONOSHANKAR CHOWDHURY |
Entire Electrification at their 4 storied residential apartment at New Alipore Block-D (Shibnath Shastri Sarani) |
2000-2001 |
7 Lakhs |
SPANDAN |
Entire Electrification at The art gallery & Corporate office at Park street. (A project of Mrs. Renuka Roy Chowdhury |
2000-2001 |
0.65 Lakhs |
MAHARAJA SANTOSH |
Entire Electrification at their residential apartment at 4, Alipore Avenue |
2000-2001 |
1.8 Lakhs |
TCG SOFTWARE |
Entire Electrical Installation, for Celcius Ltd.(banglalive.com) |
2000-2001 |
3.1 Lakhs |
L.C.C COMPUTER CENTER |
Entire Electrical Installation for Harish Mukherjee Rd Office & Sukhsagar Sarat Bose Road Office |
2001-2002 |
7 Lakhs |
TANGERINE HOTEL |
Entire Electrical Installation |
2001-2002 |
3 Lakhs |
HERO HONDA SHOW ROOM |
Entire Electrical Installation |
2001-2002 |
3 Lakhs |
MULTISTORIED BUILDING PROJECT
AT KAIKHALI NORTH 24 PARGS. |
Entire Electrical Installation |
2001-2002 |
4.5 Lakhs |
M/s. C. MACKERTICH LTD
Vaibhav Market 4, Lee Road,
Kolkata-700020 |
Entire Electrical installation, including panel building etc. |
2002-2003 |
6.5 Lakhs |
AIR SAHARA |
Entire Electrical installation, including panel building etc at Kolkata Airport |
2002-2003 |
3.5 Lakhs |
TCG SOFTWARE SERVICES
BIPL PH ii, BL-GP, Sec V |
Entire Electrical installation, including panel building etc |
2002-2003 |
9.2 Lakhs |
Webel |
Conveyor Electrification |
2002-2003 |
1.5 Lakhs |
LabVantage Solutions Pvt. Ltd.
BIPL - ii, Electronic Complex, Salt
Lake - V. |
Interior Decoration, including Electrification at their New Office. |
2003-2004 |
6.5 Lakhs |
Mr. Binoy Acharya
Jt. Sec. Technical Education. (Govt. of
W.B) |
Interior Decoration, including Electrification at residential apartment at Tollygunge. |
2003-2004 |
1.6 Lakhs |
Shrutinandan
A Music Institute of Pandit Ajoy Chakraborty,
70 Golf Club Rd, Kolkata. |
Installation of 80 Kva Captive power Generator, Including Civil foundation, and Fiber Glass Shed |
2003-2004 |
1.2 Lakhs |
Webel Tunge
A Software Academic Institution for
Animation development. |
Entire Electrical Installation & power supply system. |
2004-2005 |
5.5 Lakhs |
Lab Vantage Solutions Pvt. Ltd.
BIPL -iii, Electronic Complex, Salt Lake -V. |
Electrification at their New Office.2nd floor BIPL Building "C" |
2004-2005 |
5.5 Lakhs |
Fitek Solutions Pvt. Ltd. |
Entire Electrification at BIPL Building C |
2004-2005 |
4.85 Lakhs |
B. P. Podder Institute of Management and Technology |
Entire Electrification at their new Building Block "C" G &, for Computer Lab, Library, and Class Room, at 137,V.I.P. Road, Kolkata-
52. |
2005-2006 |
7.5 Lakhs |
Anshin Software Pvt. Ltd. |
Entire Electrification at their new Office at Infinity Tower ii. 5th floor. |
2004-2005 |
6.43 Lakhs |
Romix Agencies |
Entire Electrification at their new Project at Metro South, 123/1 NSC. Bose Rd. Tollygunge. |
2005-2006 |
6.00 Lakhs |
WBIDC |
Entire Electrical Installation, LAN Cabling, and Control Panel Building , from 3rd to 6th floor, Under Ministry of Commerce, Government of West Bengal. |
2006-2007 |
48.64 Lakhs |
Bombay Dyeing |
Entire Electrical Installation, at Bargain counter Kolkata, at Russell street. |
2006-2007 |
8 Lakhs |
WBIDC, Through Ramky Infrastructure Pvt. Ltd. |
Entire Electrification of Garment park Phase I, "Poridhan" By Name, where we have installed The infrastructure of 70 nos. of factory setup for manufacturing Garment. Total installation capacity, 1500Kva, with captive power capacity of 500Kva. Kilometers of 400 / 240 / 150 / 95 / 70 / 50 / 35 / 25 sq. mm UG TRAR Aluminum cable was laid. 39 lamp post with SRP, 2nos High Must, 33nos of Bollard was installed for area lighting. Installation of high power / AMF / Auto Change Over Panel was installed. |
2007-2008 |
2.78 Crores |
Fitek Solutions Pvt. Ltd. |
Entire Electrical Installation, Cabling, and Control Panel Building , at BIPL Omega Building excluding lighting fittings for their 10th floor Omega Building Software Set up. Sector V. Electronics Complex Salt lake |
2007-2008 |
14.99 Lakhs |
Compassion East India. |
Entire Electrical Installation, Cabling, and Control Panel Building, LAN Cabling at their Software Set up. Sector V. Electronics Complex Salt lake |
2007-2008 |
12.36 Lakhs |
WEBEL |
Entire Electrical Installation, Cabling, and Control Panel Building, at their HRDC Taratola Phase -I. |
2006-2007 |
8.00 Lakhs |
WEBEL |
Entire Electrical Installation, Cabling, and Control Panel Building, at their HRDC Durgapur Phase -I. |
2006-2007 |
3.00 Lakhs |
WEBEL |
Entire Electrical Installation, Cabling, and Control Panel Building, at their HRDC Durgapur Phase -II. |
2007-2008 |
48.00 Lakhs |
WEBEL |
Entire Electrical Installation, Cabling, and Control Panel Building, at their HRDC Taratola Ph -II. |
2007-2008
Continuing |
9.400 Lakhs |
Hunger Hydraulics. |
Entire Electrical Installation, Cabling, and Control Panel Building, Modular Transformer 630 Kva, Modular Captive power Generator, Factory machine setup wiring & light power Wiring at their Set Up at Food Park Sankrail. |
2007-2008 Continuing |
44.72 Lakhs |
Devaloke Heights. |
Entire Electrical Installation, Cabling, and Control Panel Building, internal wiring, for lighting & power for 14 storey Building . |
2007-2008 Continuing |
40.00 Lakhs |
WBIDC |
Entire Electrical Installation, for common facility Building at Shilpangan Saltlake Sector HI. For installation of Cabling, and Control Panel Building, from 3rd to 5th floor, Under Ministry of Commerce, Government of West Bengal. |
2007-2008 Continuing |
14.71 Lakhs |