Name of the Client

Project

Period

Job Value

CALCUTTTA CHEMICAL

EPABX Installation

89-90

2 Lakhs

UNITED PROPERTIES
For the Project Windsor Palace,
6A, Iron Side Rd

Wiring including installation of main power system for 74 nos. of flats of 6A Iron side road, Kolkata

90-92

20 Lakhs

NILANCHAL ESTATE

Wiring including installation of main power system for 150 nos. of flats at Oxford view, Behala

91-93

10 Lakhs

NEON APARTMENT

Wiring including installation of main power system at Hindustan Park

92-93

1.5 Lakhs

ORISSA INDUSTRIES,
ROURKELLA

EPABX system installation including entire cabling

92-93

2 Lakhs

MEHERIA & CO.

Entire Electrification at 9, Old Post Office Street. Kolkata

91-92

0.65 Lakhs

CG.CR.I.
JADAVPUR UNIVERSITY

Manufacture and installation of Thyristor Control Panel with Temperature Controller.

92-94

2 Lakhs

ASSAM TIMBER CO

Entire Electrification at Sarat Bose Road

95-96

1.43 Lakhs

HINDUSTAN CABLES LTD.
NARENDRAPORE

Manufacturing & installation control panel for Dry Armoring  machine consisting of Thyristor drive PIC. and field instrumentation at Rupnarayanpore works

95-96

4 Lakhs

SHAWLLACE & CO. LTD

Complete  electrical installation on management information center at 3 rd floor, 4, Bankshal street, Kolkata

93-94

7 Lakhs

WEBEL

Electrical installation

93-94

0.65 Lakhs

UNIT TRUST OF INDIA
THROUGH M/S ELITE INTERIOR

Complete electrical installation of Jamshedpur, Bihar

93-94

5 Lakhs

D.V.C

Complete electrical installation at Corporate Floor, Guest House & Reception

94-95

12 Lakhs

W.B.LD.C

Complete electrical installation at 1st Floor, 5, Council house street, Kolkata

94-95

7.5 Lakhs

TATA IRON & STEEL CO. LTD.
TATA STEEL

Complete electrical installation at 43, Chowrunghee rd. Kolkata.

97-98

7.5 Lakhs

CHATTERJEE GROUP OF INDUSTRIES

Complete electrical installation at 9B, Wood street

96-97

2.8 Lakhs

BANGALCLUB

Complete electrical installation at Club at Little Russell St Kolkata.

96-97

4.86 Lakhs

SOFTWARE TECHNOLOGY
SALT LAKE

Complete electrical installation at Salt Lake Office

96-97

0.82 Lakhs

BOMBAY MERCANTILE BANK

Complete electrical installation at Circus Road

96-97

2 Lakhs

INDO BURMA PETROLEUM CO.

Complete electrical installation at 34, Nirmal Ch. Street Kolkata-700012

97-98

8.67 Lakhs

PATTTON TANK LTD.

Entire Electrification at Camac street Office

97-98

2.85 Lakhs

SHREE RAM GARDEN

Entire Electrification at Alipore Road

98-99

1.75 Lakhs

MANARA

Entire  Electrification at 12, Upper Wood street Office

98-99

1.5 Lakhs

STATE BANK OF SAURASTRA

Entire Electrification at 1A A.T.M. road Kolkata

98-99

1.5 Lakhs

J.THOMAS

Entire Electrification at R.N. Mukherjee Road Nilhut House

98-99

2 Lakhs

SHRUTINANDAN

Entire Electrification at 20, golf Club Road, Kolkata
(A project of Pandit Ajoy Chakraborty)

99-2000

7.2 Lakhs

PROCTOR & GAMBLE

Entire Electrification at B.T road

99-2000

0.48 Lakhs

VIDESH SANCHAR NIGAM LIMITED (VSNL)

Entire Electrification at Tadanga main road

99-2000

6.5 Lakhs

L.K.P

Entire Electrification at park, Park Mansion

99-2000

2 Lakhs

PATTONTANK

Entire lectrification at 7th floor of 3C camac street.The Corporate Office Of M/s Patton

2000-2001

3.1 Lakhs

BUOY CHOWDHURY & MONOSHANKAR CHOWDHURY

Entire Electrification at their 4 storied residential apartment at New Alipore Block-D (Shibnath Shastri Sarani)

2000-2001

7 Lakhs

SPANDAN

Entire Electrification at The art gallery & Corporate office at Park street. (A project of Mrs. Renuka Roy Chowdhury

2000-2001

0.65 Lakhs

MAHARAJA SANTOSH

Entire Electrification at their residential apartment at 4, Alipore Avenue

2000-2001

1.8 Lakhs

TCG SOFTWARE

Entire Electrical Installation, for Celcius Ltd.(banglalive.com)

2000-2001

3.1 Lakhs

L.C.C COMPUTER CENTER

Entire Electrical Installation for Harish Mukherjee Rd Office & Sukhsagar Sarat Bose Road Office

2001-2002

7 Lakhs

TANGERINE HOTEL

Entire Electrical Installation

2001-2002

3 Lakhs

HERO HONDA SHOW ROOM

Entire Electrical Installation

2001-2002

3 Lakhs

MULTISTORIED BUILDING PROJECT
AT KAIKHALI NORTH 24 PARGS.

Entire Electrical Installation

2001-2002

4.5 Lakhs

M/s. C. MACKERTICH LTD
Vaibhav Market 4, Lee Road, Kolkata-700020

Entire Electrical installation, including panel building etc.

2002-2003

6.5 Lakhs

AIR SAHARA

Entire Electrical installation, including   panel building etc at Kolkata Airport

2002-2003

3.5 Lakhs

TCG SOFTWARE SERVICES
BIPL PH ii, BL-GP, Sec V

Entire Electrical installation, including panel building etc

2002-2003

9.2 Lakhs

Webel

Conveyor Electrification

2002-2003

1.5 Lakhs

LabVantage Solutions Pvt. Ltd.
BIPL - ii, Electronic Complex, Salt Lake - V.

Interior Decoration, including Electrification at their New Office.

2003-2004

6.5 Lakhs

Mr. Binoy Acharya
Jt. Sec. Technical Education. (Govt. of W.B)

Interior Decoration, including Electrification at residential apartment at Tollygunge.

2003-2004

1.6 Lakhs

Shrutinandan
A Music Institute of Pandit Ajoy Chakraborty,
70 Golf Club Rd, Kolkata.

Installation of 80 Kva Captive power Generator, Including Civil foundation, and Fiber Glass Shed

2003-2004

1.2 Lakhs

Webel Tunge
A Software Academic Institution for Animation development.

Entire Electrical Installation & power supply system.

2004-2005

5.5 Lakhs

Lab Vantage Solutions Pvt. Ltd.
BIPL -iii,  Electronic  Complex, Salt Lake -V.

Electrification at their New Office.2nd floor BIPL Building "C"

2004-2005

5.5 Lakhs

Fitek Solutions Pvt. Ltd.

Entire Electrification at BIPL Building C

2004-2005

4.85 Lakhs

B. P. Podder Institute of Management and Technology

Entire Electrification at their new Building Block "C" G &, for Computer Lab, Library, and Class Room, at 137,V.I.P. Road, Kolkata-
52.

2005-2006

7.5 Lakhs

Anshin Software Pvt. Ltd.

Entire Electrification at their new Office at Infinity Tower ii. 5th floor.

2004-2005

6.43 Lakhs

Romix Agencies

Entire Electrification at their new Project at Metro South, 123/1 NSC. Bose Rd. Tollygunge.

2005-2006

6.00 Lakhs

WBIDC

Entire Electrical Installation, LAN Cabling, and Control Panel Building , from 3rd to 6th floor, Under Ministry of Commerce, Government of West Bengal.

2006-2007

48.64 Lakhs

Bombay Dyeing

Entire Electrical Installation, at Bargain counter Kolkata, at Russell street.

2006-2007

8 Lakhs

WBIDC, Through Ramky Infrastructure Pvt. Ltd.

Entire Electrification of Garment park Phase I, "Poridhan" By Name, where we have installed The   infrastructure of 70 nos. of factory setup for manufacturing Garment. Total installation capacity, 1500Kva, with captive power capacity of 500Kva. Kilometers of 400 / 240 / 150 / 95 / 70 / 50 / 35 / 25 sq. mm UG TRAR Aluminum cable was laid. 39 lamp post with SRP, 2nos High Must, 33nos of Bollard was installed for area lighting. Installation of high power / AMF / Auto Change Over Panel was installed.

2007-2008

2.78 Crores

Fitek Solutions Pvt. Ltd.

Entire Electrical Installation, Cabling, and Control Panel Building , at BIPL Omega Building excluding lighting fittings for their 10th floor Omega  Building Software Set up. Sector V. Electronics Complex Salt lake

2007-2008

14.99 Lakhs

Compassion East India.

Entire Electrical Installation, Cabling, and Control Panel Building, LAN Cabling at their Software Set up.  Sector V. Electronics Complex Salt lake

2007-2008

12.36 Lakhs

WEBEL

Entire Electrical Installation, Cabling, and Control Panel Building, at their HRDC Taratola Phase -I.

2006-2007

8.00 Lakhs

WEBEL

Entire Electrical Installation, Cabling, and Control Panel Building, at their HRDC Durgapur Phase -I.

2006-2007

3.00 Lakhs

WEBEL

Entire Electrical Installation, Cabling, and Control Panel Building, at their HRDC Durgapur Phase -II.

2007-2008

48.00 Lakhs

WEBEL

Entire Electrical Installation, Cabling, and Control Panel Building, at their HRDC Taratola Ph -II.

2007-2008
Continuing

9.400 Lakhs

Hunger Hydraulics.

Entire Electrical Installation, Cabling, and Control Panel Building, Modular   Transformer 630 Kva, Modular Captive power Generator, Factory machine setup wiring & light power Wiring at their Set Up at Food Park Sankrail.

2007-2008 Continuing

44.72 Lakhs

Devaloke Heights.

Entire Electrical Installation, Cabling, and Control Panel Building, internal wiring, for lighting & power for 14 storey Building .

2007-2008 Continuing

40.00 Lakhs

WBIDC

Entire Electrical Installation, for common facility Building at Shilpangan Saltlake Sector HI. For installation of Cabling, and Control Panel Building, from 3rd to 5th floor, Under Ministry of Commerce, Government of West Bengal.

2007-2008 Continuing

14.71 Lakhs

 

Name of the Client

Type of Maintenance

Period

Value (PA)

Datamatics Limited
63, Rafi Ahmed Kidwai Rd.    Kolkata-700071.

Maintenance of 160 Kva power panel, including operational maintenance of 70 ton Voltage Central Air conditioner Unit.

1985 - 2000

90000.00

Damoder Valley Corporation, DVC Tawer, Ultadanga

Maintenance  of 2000  k.v.a power panel, including operational maintenance of 2x100 Kva Captive power Generator including handling Synchronizing panel.

1996 -2000

120000.00

Shrutinandan,
70, Golf Club Rd., Kolkata.

Call service Maintenance of 60 k.v.a power panel, including power supply maintenance of 35 ton Carrier Air conditioner, & 80Kva Generator Unit.

1994-Continuing

15000.00

West Bengal Industrial
Development Corporation.
5, Council House Street,Kolkata-1

Maintenance of 60 k.v.a power panel, including operational maintenance of 7.5 k.v.a Kirloskar Captive Power Generator. & input power of  30 ton   air-conditioned Unit.

1995-Continuing

162000.00

Indian Oil Corporation.
(A Govt. of India Enterprise.)
34, Nirmal Chandra Street, Kolkata-700013.

Maintenance of 1000 k.v.a power panel, including operational maintenance of 500 k.v.a. Captive Power Generator.

2000-2002

3,45,000.00

TCG Software Services Pvt. Ltd.
Sector V, Salt lake.

Maintenance of 150 kva. Power panel,    including, input power maintenance of 80 k.v.a ups, 30 k.v.a server, and lighting load

1994-Continuing

60000.00

Labvantage Solutions Pvt. Ltd.
BIPL iii, Sector V Salt lake, Kolkata

Comprehensive Maintenance for their I.TW.S unit at BIPL Building C

2005 Continuing

96000.00

Maya Trade Link
Kolkata

Operational Maintenance of  500 k.v.a Transformer, with 250 k.v.a Captive power unit with diesel primover.

2004

60000.00

Anshin Software Solutions Pvt. Ltd.
Infinity Tower ii, Sector V, Salt Lake.

Maintenance for their I.T W.S unit at Infinity Tower ii 5th Floor.

2005 Continuing

72000.00

Software Technology Park India. A Govt. of India enterprises.

Maintenance of their Software Set up at eastern region.

2007 Continuing

150000.00

West Bengal Power Development Corporation Ltd.

H.T Maintenance of the entire Bidyut Unnayan Bhavan.

2009 Continuing

144000.00