Some of our major areas of activity in the
recent past are as follows :
|
| The
Angel atop the Victoria Memorial Hall |
| |
| 1984
VMH approached Jadavpur University for enlivening the Angel. |
| 1985
Angel revitalized under guidance of the undersigned; work
force supplied by Jessop; time taken about 4/5 months. |
| June
1998* Letter from AST regarding AMC for the Angel with
a third party.(Not recommended by the undersigned) |
| March
1999* Another letter from ASI regarding AMC (Declined
to recommend). |
| April
1999* ASI alongwith VMH representative met me at the
University. I was informed that the Angel had stilled. |
| My reaction |
- Earthing system tampred with.
- Earthing Copper strip stolen-FIR lodged by VMH subsequently.
- Instructed to follow the revitalization steps as in 1985.
|
| April
1999 Wrote to VMH |
| September
2001 VMH contacted me |
| August
2003 VMH contacted me with Jessop's quotation. |
| February
2004 Jessop requoted. |
| March
2004 :Order given. |
| April
19, 2004 Work started |
| October
2004 Shri A. K. Aich inducted to supervise the job
on the spot. |
| November
2004 |
- ASI requested to open a few stone pieces from below
the Kalash
- SI disagreed on the plea that it would destabilize the
dome.
- Jt meeting convened twice for across-the-table discussion.
- ASI abstained from both
- Letter given stating that ASI's apprehension was misplaced.
- Access to the top bearing housing felt essential.
|
| January
15, 2005 Revitalization work suspended till access
to top bearing housing be arranged. |
| September
9, 2005 |
- Another Jt meeting was called
- ASI representative Engineer attended
- No discussion about the stability problem
- Decided to temporarily remove two stone pieces in 1st
week/ 2nd week of December 2005.
|
| March
1, 2006 Work done (i.e after a lapse of 1 year and
4/5 months) |
| April
1, 2006 The Angel started rotating on and from the
date. |
| April
2, 2006 Cleaning of the iron-powder in praticular from
the top bearing housing and fitting the missing fasteners. |
| May
6, 2006 Maintenance arrangement done. |
| May 8, 2006
|
- Cleaning of the structure on which the Angel is supported
& its painting.
- Dome-inside ceiling damaged portion stripped off and
replastered by ASI, lime washing not done.
|
| May
31, 2006 Two stone pieces reset and pointing done by
ASI/2nd Earthing work by CPWD started. |
| June
5, 2006 2nd Earthing work continued. |
| June
9, 2006 Lime washing of replastered areas by ASI |
| June
12, 2006 Fitting of S. S. Screen to prevent nesting
of birds. |
| June
17, 2006 Top bearing housing oil changed after flushing
with pressurized diesel. |
| June
23, 2006 Bottom bearing housing oil changed. |
| June
28, 2006 Top bearing housing oil changed after flushing
with pressurized diesel. |
| July
1, 2006 Top housing bottom gland cleaning & changing
of bottom housing lubricant. |
| July
6, 2006 Handed over to VMH authority |
| Study
of Environmental Effect of Light which includes : |
- Contribution of Sun on Evolution of Healthy Atmosphere
- Contribution of Light to the Environment
- Contribution of Light to the Atmosphere
- Contribution of Light to the Hydrosphere
- Contribution of Light to the Lithosphere
- Contribution of Light to the Biosphere
- Spectral Analysis of Various Light Sources
- Spectral Diagram
- Spectral Quality Analysis
|
| The
Control of Major Hazards in India which includes : |
- Proposed Major Hazard Works Definition
- Major Emergengy & Key Personnel
- Emergency Control Centre
- Formulation of the On-site Emergency Plan
- Method of Declaring Emergency & Activating Emergency
Plan
- Evacuation
- Action Outside the Works
|
| Noise
Assessment and Abatement of Vibration in Industry and Its Effects
on The Workers |
| |
| Housekeeping |
- Building
- Floors/Working Surface
- Machinery & Equipments
- Material
- Waste Disposal
- Plant Hosekeeping
|
| |