CLIENTELE FOR IMPLEMENTATION OF EFFLUENT TREATMENT PLANT (ETP) AND
AIR POLLUTION CONTROL SYSTEM (APC) BY
M/S. AWS POLLUTION AND PROJECT CONSTRUCTION PRIVATE LIMITED.


We have implemented ETP and APC in the following Industries :


Sl.
No.
Organization Description
01 M/s. Eveready Industries (I) Ltd., (Union Carbide), Kolkata – 700 002.
Year of implementation : 1984

EFFLUENT TREATMENT PLANT
Pollutant Removed : Suspended solid & organic load from Canteen.
02 M/s. BATA India Limited,
Batanagar, Dist.24 Parganas (S)
Year of implementation : 1984

EFFLUENT TREATMENT PLANT
Pollutant Removed : Tannery effluent containing hexavalent chromium sulphide suspended solid and organic matter.
Scope of Services : Treatment Plant Design and Commissioning.
03 M/s. Rallis India Ltd.,
Konnagar, West Bengal
Year of implementation:1986-87

EFFLUENT TREATMENT PLANT
Pollutant Removed : Suspended matter like iron & carbon, organic load generated from dextrose and ethyl alcohol processing.
Scope of Services : Augmentation, renovation and operation of biodegradable activated sludge plant.
04 M/s. Reckitt & Colman of (I) Ltd., Calcutta – 700 068.
Year of implementation : 1987
EFFLUENT TREATMENT PLANT
Pollutant Removed : Parachloro Metaxylene Chlorophenol, Copper & organic matter.
Scope of Services : Detail design engineering commissioning and operation of effluent treatment plant. The treatment covers removal of copper & PCMX (Parachloro Metaxylene)
05 M/s. Britannia Industries Ltd. Taratala Road, Calcutta.
Year of implementation : 1988-89

EFFLUENT TREATMENT PLANT
Pollutant Removed : Organic matter containing flour fats, milk, oil & grease, etc. (i.e. removal of BOD, COD, Oil & Grease, TSS)
Scope of Services : Commissioning and operation of Effluent Treatment Plant which includes treatment through dissolved air floatation cell and biodegradation activated sludge treatment plant.
06 M/s. ITW Signode Limited,
Hyderabad.
Year of implementation : 1992

EFFLUENT TREATMENT PLANT
Pollutant Removed : Spent liquor from pickling chamber.
Scope of Services : Detail design engineering & Commissioning of treatment plant
07 M/s. Pepsi Company Ltd.,
Panagarh, Dharala, Burdwan
Year of implementation : 1995

EFFLUENT TREATMENT PLANT
Pollutant Removed : Suspended particulate matter like carbon, oil & grease and organic load arising out of sucrose.
Scope of Services : Details design, engineering, commissioning & operation of biodegradation plant.
08 M/s. NICCO Corporation Ltd., Shyamnagar,West Bengal.
Year of implementation : 1995

EFFLUENT TREATMENT PLANT
Pollutant Removed : Suspended solid, BOD, COD, Oil & Grease from canteen effluent.
Scope of Services : Detail design, engineering and commissioning of effluent treatment plant.
09 M/s. India Foils Limited,
Kamarhati, West Bengal.
Year of implementation : 1996

EFFLUENT TREATMENT PLANT
Pollutant Removed : Organic matter and heavy metals being generated out of printing & Processing of aluminum foils.
Scope of Services : Details design engineering & commissioning of biodegradation plant.
10 M/s. Star Battery Ltd.,
Dankuni, Hooghly.
Year of implementation : 1997

EFFLUENT TREATMENT PLANT
Pollutant Removed : Suspended solids/Lead, TSS, Oil & Grease being generated for manufacturing lead acid battery.
Scope of Services : Supply of equipment like clarifier, filter, etc. Details designing, engineering, commissioning of primary treatment plant with pH controller etc.
11 M/s. Ganges Vally Foods Ltd., Dankuni, Hooghly
Year of implementation : 2000

EFFLUENT TREATMENT PLANT
Pollutant Removed : BOD, COD, Oil and Grease, TSS.
Scope of Services : Implementation of Industrial Effluent Treatment Plant including design, supply and erection and commissioning and operation.
12 Shree Jagarnath Enterprise,
Jagatdal, 24 Pgs (N).
Year of implementation : 2001

Plant for Air Pollution Control
Pollutant Removed : Lead Particulate generated from plate melting pot of Automobile Battery Manufacturing Unit.
Scope of Services : Design, Engineering, Supervision, installation and commissioning of air pollution control system.
13 M/s. National Buildings Construction Corpn. Ltd.,
MERI Unit, Kolkata.
Year of implementation:2001-02

Designing & detailing of Sewage Treatment Plant
Pollutant Removed : Sewage treatment of the entire camp of MERI, Kolkata.
Scope of Services : Design, Engineering & supervision and commissioning.
14 M/s. Rahimafrooz Batteries Ltd.,
Dhaka, Bangladesh.
Year of implementation : 2002

Effluent Treatment Plant
Pollutant Removed :
  • Effluent Treatment Plant (ETP) for removing of Suspended solid/Lead/Oil & Grease being generated from Lead acid Battery manufacturing process.
  • Air Pollution Control Measures (APC) for removal of Lead dust, acid fumes and general ventilation.
Scope of Services : For both the projects of ETP and APC, it was a Turnkey contract. This includes studies on process of treatment/system design, engineering and fabrication of equipment, supply, erection and commissioning
15 Mission of Mercy Hospital Park Street, Kolkata
Year of implementation:
2002-03

Bio Medical Waste Treatment
Pollutant Removed : Steam sterilization of bio-medical wastes of hospital using autoclave and shredder.
Scope of Services : Design, supply, installation and Commissioning of steam sterilizing autoclave and shredder with automated instrumentation and data recording system.
16 Exide Industries Ltd.
Shyamnagar.
Year of implementation : 2003

   
  Project – 1
Air Pollution Control Device
Pollutant Removed : Acid Fume
Scope of Services : Design, supply, installation, commissioning of dust collectors, bag filters, blower, ducting system etc.
  Project – 2
Air Pollution Control Device
Pollutant Removed : Lead fumes from Lead melting pot.
Scope of Services : Design, supply, installation, commissioning of dust collectors, bag filters, blower, ducting system, etc.
  Project – 3
Air Pollution Control Device
Pollutant Removed : Lead Particulates generated by buffing and cutting of lead plates.
Scope of Services : Design, supply, installation, commissioning of dust collectors, bag filters, blower, ducting system, etc.
17 Bridge & Roof Co. (I) Ltd. Howrah.
Year of implementation : 2003

Effluent Treatment Plant
Pollutant Removed : Acid removal of phosphate, Zinc, Iron & other heavy metals being generated from Pickling and phosphating unit.
Scope of Services : Design, Engineering & Supply of Effluent Treatment Plant (ETP).
18 Cox’s Bazar Sea Food, Bangladesh.
Year of implementation : 2003

Iron Filter
Pollutant Removed : Water Treatment Plant - Iron Removal Plant for Fish processing unit.
Scope of Services : Design, Engineering & supply of Water Treatment Plant.
19 British American Tobacco Bangladesh Company Ltd. (BAT), Bangaladesh.
Year of implementation : 2005

Effluent Treatment Plant
Pollutant Removed : Suspended solids, organic matter, Oil & Grease.
Scope of Services : Design, Engineering & supply of Effluent Treatment Plant.
20 ZABAIR & ZUBAIR FABRICS LTD., Bangladesh.
Year of implementation : 2005
Effluent Treatment Plant
(Textile Industry)
Treatment capacity : 120 M3/Hour of Wastewater.
Pollutant Removed : TSS, organic matter (Dyes and intermediates), Oil & Grease.
Scope of Services : Design, Engineering & supply of Effluent Treatment Plant
21 SAR Silicon Systems Pvt. Ltd.,
Himachal Pradesh.
Year of implementation : 2005

Effluent Treatment Plant
Pollutant Removed : Heavy metals (Lead & Zinc), TSS, Oil & Grease.
Scope of Services : Design, Engineering & supply of Effluent Treatment Plant.
22 Sharp Ferro Alloys Ltd., Durgapur.
Year of implementation : 2005

Air Pollution Control Device
Pollutant Removed : Suspended Particulate matter
Scope of Services : Design, Engineering & supply of all mechanical items.
23 Durgapur Steel Plant Hospital
SAIL, Durgapur
Year of implementation : 2004

Bio-Medical Waste Treatment
Pollutant Removed : Steam sterilization of bio-medical wastes of hospital using autoclave and shredder.
Scope of Services : Design, supply, installation and Commissioning of steam sterilizing autoclave and shredder with automated instrumentation and data recording system.
24 N.J. Leather Enterprises Ltd.,
Kolkata Leather Complex.
Year of implementation : 2005

Effluent Treatment & Chrome Recovery Plant
Pollutant Removed : Chromium from effluent.
Scope of Services : Design, supply, installation and Commissioning of Pre-treatment Plant and Chrome Recovery Plant. for removal / recovery of Chromium of the effluent generated.
25 Titan Leather Pvt. Ltd.
Kolkata Leather Complex.
Year of implementation : 2005

Effluent Treatment & Chrome Recovery Plant
Pollutant Removed : Chromium from effluent.
Scope of Services : Design, supply, installation and Commissioning of Pre-treatment Plant and Chrome Recovery Plant. for removal / recovery of Chromium of the effluent generated.
       
Powered By : www.calcuttayellowpages.com
home home Contact Us Feedback Form About Us Our Services Laboratory Infrastructure Clientele & Projects Clientele of ETA etc. Clientele Safety Audit O & M ETP & Autoclave Technical & Safety Personnel Expert Consultants